Supply And Installation Of One Coach Set Of Body Shell Items For Lhb Ac Co Mposite (Lwfcwac)-(832) As Per Wa10149(Stage-I) & Wa10150(Stage-Ii) 01) Aaa10963, Col.I- 2 No S 02) Ssa10018, Col.I- 4 Nos 03) 58110015, Alt "A", Col.I- 6 Nos 04) 58110016, Alt "A", Col.I- 6 N Os 05) Aaa10972, Alt "A", Col.I- 4 Nos 06) Aaa10967, Col.I- 2 Nos 07) Aab10014, Col.I- 4 Nos 08) Aaa10970, Col.I- 4 Nos 09) 58110017, Alt "C", Col.I- 2 Nos 10) Wa10148, Alt "B" Anx-4, Col.I- 1 No 11) Wa10155, Alt "C" Anx-1, Col.I- 1 No 12) Le10237, Col.I- 1 No 13) Aaf10937, Alt "Nil" - 14 Nos. Special Condition : 1. The Chair Pillars Shall Be Packed In The Container As Per Icf/J&T/Sk-1865-Alt 'A'. 2. Other Partition Frames Not Fitting In The Container Shall Be Stacked One Over The Other, Secured U Sing Packing Strip And Placed In Steel Pallet. 3. The Height Of Each Stack Shall Not Exceed 750Mm For E Asy Handling. 4. Suitable And Sufficient Packing Strips To Be Used Such That Stacked Items Do Not Disint Egrate During Transit, Storage And Handling. - Installation Required Annexure A Dtd 13.09.2023 To Be Followed Supply Rate And Installation Rate To Be Quoted Separately. [ Warranty Peri Od: 30 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitt Ed: Max 8 Lacs ] ]