Object: Hiring An Engineering Service For The Execution Of A Public Lighting Network With A Length Of 3.579 Km On The New Access (Highway) To Be Built To Serve The New Electrolux Factory, Containing 174 Double Curved Poles And 4 Concrete Poles With Petal Lighting For 4 Luminaires, Both With Heights Of 12.00M.