Shell Kit For Memu Dmc1 Jk 944 A. Roof Assembly - 94416001 000 01 Alt 'Nil' - 1 No. Lo Cation Of Sidewall -94414001 000 01 Alt 'Nil' - 1 No. End Construction Pail End -94515001 000 01 Alt 'A ' - 1 No. Firm Shall Fulfill The Manufacturing Facility As Per Icf/Md/Specn-200, Issue Statu S 01, Rev 04 With Amendment No 01. Firm Shall Fulfill The Manufacturing Facility As Per I Cf/Md/Specn-315, Issue Status-01, Rev.00 With Amendment No 01. B.Supply Of One Coach Se T Of Body Shell Items And Partition Frames For Memu Dmc Jk 944 To Drawing Nos: 1. 94410 003 000 01 Alt 'A' - 1 No. 2. 74510257 000 01 Alt Nil - 1 No. 3. 94410004 000 01 Alt Nil - 1 No. 4. 7451 0045 000 01 Alt Nil - 1 No. 5. 94410005 000 01 Alt Nil - 1 No. 6. 94410002 000 01 Alt 'B' - 1 No. 7. 944 10076 000 01 Alt Nil - 1 No. 8. 94410072 000 01 Alt Nil - 1 No. 9. 94410054 000 01 Alt Nil - 2 Nos. C. U Nderframe Arrangement 94411001 000 01 Alt 'B' - 1 No. Firm Shall Fulfill The Manufacturing Fa Cility As Per Icf/Md/Specn-147, Issue Status-01 Rev.02 With Amendment No.02. Special Conditi On : Packing As Per Icf/J&T/Misc-2201, Alt 'F'. Packing As Per Icf/J&T/Sk-1809, Alt 'A'. Packing C Ondition As Per Drg.No.Icf/J&T/Misc-2487, Alt 'B' The Underframe Should Be Supplied As N Ormal Side Up & Side Bearer Side Down. Packing Conditionas Per Icf/J&T/Sk-1865, Alt 'A'. (A) Raw Material Stage # Ensure The Raw Material Used Using Portable Spectrometer (B) Jig Stage # Assem Bly Of Front Part With Sole Bar. # Assembly Of Modular Frame Arrangement. # Weld Parameters To Be C Hecked & Recorded (C) Trestle Stage # Marking, Drilling & Tapping Of Holes Wherever Necessary. # Mar King & Placing Of Detail Items. # Complete Welding Wherever Necessary. # Weld Parameters To Be Che Cked & Recorded # Assembly & Welding Of Trough Sheets. # Dimensional & Visual Checks. # Punching Of Serial No & Ensuring Proper Traceability. (D) Surface Preparation And Painting Stage. # Short/Sand B Ast To The Requirements. # Painting Process As Per The Specification. # Visual Inspection. # Final Produ Ct Inspection. Note: Application Of Aluminium Welding Coat To Rcf Spec Mdts-28272 Latest Revision On Top Surface Of Cross Members Shall Be Ensured Before Welding The Trough Floor With Cross Members To Avoid Bi-Metallic Corrossion. [Safety Item] [ Warranty Period: 30 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitt Ed: Max 8 Lacs ] ]