Factory Made Precast Box Cells, Industry Made Precastconcrete Elements, B Of Of 2M X 2M X 1M, Height 2.8 Mfrom Bottom To Top Of Arch Internal, 200 Mm Wall Thickness, Cost Cells Sq Without Arch, 6 Toilet Of 2X2X1.50M Precastfactory Vertically Casted With Dry Cast Tech, Hydraulicallypressed All Side Vibrated For Max Str M 40 Gde , Cementopc 43 Grade Packed In Hdpe Bag Each 50 Kg Wtconforming To Is 8112 To 1989 Make Birla Gold Or Ambuja Orultratech Or Acc Or Jk Or Dalmiya , Course Sand Free Fromvegetation , Stone Aggregate , Water Proofing Compound20 Ltr Confirming To Is 2645 2003 Of Make Pidilite, Dr.Fixit,Fevicol , Quick Setting Compound 20 Ltr Of Make Pidilite, Dr.Fixit, Fevicol , Rolling And Stone Machinary Cost At Pcclevel, Including Compaction And Leveling Cost , Geo Textileof 200 Gsm To Be Used Above Pcc To Prevent Passage Ofwater Above Pcc , Srf Membrane Cost 500 Per 700 Sheet ,Quick And Water Proofing Setting Compound For Coldtempreture , Hdpe And Perforated Pipes For Water Proofslipage Water , Precast Stair Case , Side Walls Bricks Castedper Precast , Damproof And Water Proofing Chemicalapplied All Over Three Sides Exterior And Four Sides Interior, Light Solar One , Furniture Cost Benches Cost Of 4 Feeteach, Three Line Seating Arrangements , Srt 2Mm Thick2.50Ft Width And 8Ft Length , Ismb 100Mm X 100Mm X 6Mmthickness Of 18 Ft Length. , Door Of 3.50Ft X 6 Ft As Peropening Of Entry Exist Position Required. , Wall Putty , Paintwork Internal And External , Wiring And Casing Pipes , Wires, Sanitary Ware And Wash Basin And Pipes For Toilet One Nos, Sanitarty Pipe And Septic Tank, Water Sunk Storageprovisions , Fire Fighting , Ventilation Cost Air Ventilationsystem Quantity: 11788