Purchase of major repair works of the 2nd building of the Azerbaijan State Oil and Industry University Excavation of soil by throwing it out of the trenches with backhoe excavators with a capacity of 0.5 (0.5-0.63)m3, soil group: 2 (Excavation of soil along the perimeter from the outside to insulate the foundation walls /325 x 0.8 x 2.6 = 676 m3)) leveling with a solution with polymer additives, layer thickness up to 10 mm (smoothing of walls for gluing ruberoid up to 30% of the total area) Waterproofing of walls and foundations: 2 layers with adhesive on the side, leveled surface of brick, concrete and butt masonry (insulation of the foundation walls with 2 layers of ruberoid) Soil repositioning of pits and trenches with bulldozers up to 5 m filling, bulldozer power: 59 (80) kW (a.g.), group 2 soil Compaction of soil with pneumatic rammers, soil group: 1, 2 Laying ceramic drainage pipes, diameter: 300 mm (Building a drainage line from a D-150 mm pipe along the perimeter of the building)
You need to pay from a subscription to see Notice Body.
Please note that this notice is for your information only.
We try our best to have the most accurate and up-to-date information
available on our web site, but we cannot guarantee that all of the
information provided is error-free.
If you have any updates,corrections,or complaints related to this notice,
please contact the responsible purchaser directly.