Construction of a new park designed on Yusif Gasimov street, Guba city. Excavation of the soil by throwing it aside with excavators of the "reverse pile" or "dragline" type with a bucket capacity of 0.5 (0.5-0.63) m3, soil group: 2. Filling pits and ditches with bulldozers by moving the soil to a distance of up to 5 m, bulldozer power: 59 (80) kW (a.g.), 2nd group soil (excavated soil on the territory 4579 m3 and planning on the territory of 488 m3 of the soil from the foundations) compaction of the soil in the first pass along one track with an 8 t punch trailer roller, layer thickness: 10 cm must be added to norm 01-02-002-01 during each subsequent pass along one track (Additional 6 trips) Excavation of the soil by dumping it with excavators of the "reverse bucket" or "dragline" type with a capacity of 0.5 (0.5-0.63) m3, soil group: 2 (23.5 m3 of excess soil from the foundation will be used for vertical planning) In sloped trenches with a depth of up to 2 m, the soil is manually dug without fastenings excavation, soil group: 2