Clearing Work Description Of The Planned Measure The Expansion Of A Park In Frankfurt-Fechenheim, Divided Into Several Partial Construction Phases, Is Planned On A Total Area Of Approx. 58,000 M². The Subject Of The Tender Is Felling And Clearing Work In A Part Of The Planning Area Of Approx. 12,000 M², Which Is Necessary To Carry Out The Following Landscaping Work In Construction Phase 1. Access: - From The North-East Via The B8, Alt-Fechenheim, Jakobsbrunnenstrasse To Konstanzer Strasse, Access On Site Path Width Approx. 2-3M-From The North-West Via The B8, Dieselstrasse/Carl-Benz-Strasse To Ferdinand-Porsche-Strasse, Access To The Site, Path Width Approx. 3Minner Access: Unpaved Paths With Widths Between 0.5 And 3.5M Walking Speed Applies For The Construction Site Area. Electricity: The Construction Site Power Connection Must Be Provided By The Contractor. The Contractor Is Responsible For Making The Necessary Coordination For Supplying His Own Construction Site With Electricity. Water: The Construction Water Connection Must Be Provided By The Contractor. The Contractor Is Responsible For Making The Necessary Coordination For Supplying His Own Construction Site With Water. Waste Water: The Sewage Connection For The Construction Site Must Be Provided By The Contractor. Toilets: Must Be Provided By The Contractor For The Duration Of The Construction Period (Construction Site Facilities) Other: There Are No Connections Available. Noise Emissions For The Execution, The Specifications For Noise Emissions In Residential Areas Must Be Adhered To. Noise-Intensive Work Is Only Permitted During The Following Times: Monday To Saturday Between 7:00 A.M. And 8:00 P.M. - Ta-Lärm. Between 6:00 A.M. And 7:00 A.M. And From 8:00 P.M. To 10:00 P.M., Work Can Be Carried Out With Low Noise Emissions, Max. 40 Db. Crowds: Approx. 260 M Construction Fence Approx. 30 Tons Waste Disposal Approx. Clear And Dispose Of 920 M² Of Shrubs Up To 3.00 M Approx. 10,710 M² Of Shrubs 3.00 M To 5.00 M Cleared And Disposed Of Approx. Clear And Dispose Of 35 Individual Bushes Up To 6.00 M Approx. Clear And Dispose Of 5 Trees Up To A Trunk Diameter Of 20 Cm. Clear And Dispose Of 16 Trees Up To A Trunk Diameter Of 40 Cm. Clear And Dispose Of 7 Trees Up To A Trunk Diameter Of 60 Cm. Clear And Dispose Of 1 Tree Up To A Trunk Diameter Of 80 Cm. Clear And Dispose Of 1 Tree With A Trunk Diameter Of Up To 120Cm Approx. Carry Out 50 Pieces Of Crown Pruning According To Ztv Tree Care, Including Disposal1 Psch Inspection And Assessment By An Expert Approx. 10 M³ Earthworks / Search Holes Approx. 11,630 M² Mowing Of The Cleared Vegetation Area (6 Ag Spread Over 2 Years) The Felling Work Must Be Carried Out In The Area Of ​​The Processing Area, Taking Into Account And Special Protection Of The Existing And To Be Preserved Trees As Well As Existing Buildings And Surfaces. This Must Be Taken Into Account In The Corresponding Standard Prices And Will Not Be Remunerated Separately. The Trees That Are Accessible Without Cutting Back The Blackberry Growth Will Be Marked On Site By The Construction Supervisor Before The Felling Work. Further Trees Will Be Marked After The Extensive Shrub Growth Has Been Cleared. Shrubs Are To Be Cleared, Including The Rootstock, While Protecting The Trees To Be Preserved, According To The Plan. Blasting Is Prohibited When Clearing. The Contractor Is Free To Decide Whether He Transports The Cuttings In Pieces Or As Chopped Material. This Must Be Taken Into Account In The Individual Items And Will Not Be Remunerated Separately.