Roof Sealing And Plumbing Worknew Construction Of The Friedberg Fire Station - Ockstadtroof Sealing And Plumbing Workthe Subject Of The Service For The New Construction Of The Ockstadt Fire Station: - Approx. 1,080 M2 Of Vapor Barrier Cold Self-Adhesive Membrane - Approx. 1,080 M2 Of Gradient Insulation In The 230 Nis 240 Mm - Approx. 1,080 M2 2-Layer Roof Sealing Made Of Du Cold Self-Adhesive Polymer Bitumen Membrane, Do Polymer Welding Membrane - Approx. 1,080 M2 Protective Layer - Approx. 1,080 M2 Green Roof Structure Made Of Extensive Substrate Thickness Approx. 8 Cm - Approx. Pv Module Elevation, Load-Bearing - Approx. 85 Running Meters Of Parapet Cover, Galvanized Sheet Steel - Approx. 50 Running Meters Of Rainwater Downpipe - Approx Friedberg Is Planning To Build A New Building For The Volunteer Fire Department In Ockstadt. Construction Descriptionthe Building Is Divided Into Two Parallel Bars, Which Are Arranged Slightly Offset From One Another. The Bars Each Have A Length Of Approx. 35.00 M And Vary In Height From Each Other By Approx. 7.0 M Or 8.0 M. The Narrow Sides Of The Bars Face Friedberger Straße. The Lower Bar Serves As A Vehicle Hall With A Service Connection Room, Storage And Workshop. It Has A Width Of Approx. 12.50 M. The Higher Block Is Two-Storey And, With A Width Of Approx. 14.00 M, Contains Changing Rooms, Training And Lounge Rooms, Offices And Sanitary Rooms. The Hall And The Adjacent Ground Floor Of The Two-Storey Block Have A Facade Made Of Galvanized Sheet Steel Panels. The Upper Floor Stands Out Visually With Its Overhang And Vertically Structured Wooden Facade.