Demolition Workthe Winter Service And Workshop Building From 1970 Is To Be Dismantled Above Ground. The Building Is Located Within The Operational Area On The Apron At Frankfurt Airport And Covers Levels Eu1 To E02 With A Total Gross Floor Area Of ​​Approx. 11,000 M³. Before The Actual Dismantling Work Begins, The Building Must Be Separated From The Aviation Security Area Of ​​The Apron In Terms Of Structure And Safety. For This Purpose, The Client Will Lay The Apron Fence In Advance In Order To Ensure Construction Site Access And Access From The Operational Area. The Building Must Be Completely Gutted And Pollutant Remedied. The Dismantling Includes The Above-Ground Supporting Structure As Well As The Basement Ceiling (Ceiling Above The Basement). The Basement Walls, Load-Bearing Supports And The Floor Slab Remain In The Ground. The Remaining Basement Space Will Be Statically Filled And Compacted In Order To Then Create A Paved Traffic Area Of ​​Load Class Slw 60. The Existing Underground Car Park Entrance Will Be Partially Filled In The Curve Area And The Ceiling Head Will Be Dismantled With Little Vibration. Scope Of Services: - Clearing Out And Gutting The Entire Building (60,000 M³ Of Enclosed Space) - Remediation Of Pollutants - Above-Ground Dismantling Of The Building (33,000 M³ Of Enclosed Space) - Field-By-Field Dismantling Of The Basement Ceiling With Simultaneous, Gradual Static Backfilling Inside Walls - Partial Dismantling Of The Underground Car Park Entrance (Ramp Structures And Angle Support Walls) In The Curve Area - Static Partial Backfilling And Gradual Densification Of The Remaining Basement Interior