To Renew The Traction Current Switch Room In The Light Rail Central Workshop, A New Underground Cable Route Is To Be Run From The Switch Room To The Hall. Type And Scope The Civil Engineering Planning For Laying The Feeder Cables Is Divided Into Several Measures. 1. New Construction Of Empty Pipe Routes From The Transformer Building / Control Room, A New Empty Pipe Route Will Be Laid Across The Park, South Of The Relocated Lightweight Hall, Across The Stzw Access Area/Bypass, Through The Stzw Basement To The Stzw Entrance On Track 21. 2. Laying The Feed Cables Into The Hall (Stzw) Laying The Feed Cables Into The Empty Pipe Route And Continuing The Feed Cables In The Basement Of The Stzw (With A Wall Breakthrough) Up To The Existing Ceiling Breakthrough Between The Basement And Ground Floor. From There Continue Along The Wall To A Height Of Approx. 1.00-2.00M On The Ground Floor. A Muff Point Is Provided At This Point So That The Feed Cables Can Be Laid To The Busbars/Distribution Boxes In The Next Step.