, B 255, Kp B 255/Walther-Rathenau-Str., Herborn, Lot 1; Construction Worklot 2; Traffic Safetylot 3; Marking Workconstruction Work:-Approx. Milling 2,480 M² Of Asphalt And Picking Up Approx. 575 M² Of Asphalt - Approx. 170 M² Of Pitch/Tar-Containing Asphalt - Approx. 245 M³ Excavated Earth And Soil Removal Including Disposal/Removal - Approx. Create 2,380 M² Asphalt Surface Course, 2,100 M² Binder Course And 2,135 M² Base Course - Approx. Install 355 M³ Frost Protection Layer / Unbound Base Layers And Approx. 230 M² Subgrade / Frost Protection - Approx. Remove 725 M Of Longitudinal/Transverse Markings And 60 M² Of Markings - Approx. Pick Up And Dispose Of 470 M Of Shelves - Approx. Set 280 M Of Shelves (High, Low, Round, Rolling, Tactile And Flat Shelves) As Well As 32 Pieces Of Special/Bus Cap And Transition Stones - Approx. Produce/Lay 340 M² Of Concrete Paving, Tactile Panels And Adjustment Surfaces - Approx. Cover 225 M² Of Topsoil And Sow Lawn - Install 1 Rainwater Treatment System And 2 Inspection Shafts Dn 1000 - Remove 17 Street Gullies And Install Or Set Up 18 New Street Drains - Approx. Lay/Fill 95 M Of Drainage Pipes (Dn 150) - Approx. Lay 520 M Of Cable Protection Pipes (Lsa And Municipal Utilities) Incl. 140 M Of Cable Trench - Install 13 Cable Ducts/Junction Boxes (Azk) And Break Off 7 - Create 8 Pole Foundations (Lsa) And Demolish 19 M³ Of Old Foundations - Dismantle/Adapt 3 Lamp Poles (Incl. New Foundations), Cupboard, Railing And Sign Construction Site Setup/Clearance, 3 Months Construction Office Maintenance, Measurement, Documentation And Control Testslot 2; Traffic Safety:-3 Psch Traffic Safety (Ba 1-3) Including 3 Mobile Traffic Lights Set Up/Dismantled And Kept For 84 Days-Approx. Make And Remove 25 M Temporary Markings As Well As 17 Pieces Of Temporary Arrows And Outcrossingslot 3; Marking Work:-Approx. 377.5 M Make Final Longitudinal And Transverse Markings (Hot Plastic) - Make 14 Pcs Final Arrow Markings And Cyclist Symbols