Ve-01-3533_Dry Construction Stage 1Dry Construction Stage 1 At The Mühlenkreiskliniken Aör, Extension Of The Bad Oeynhausen Hospital To The Auguste-Vikotria-Klinik (Boe).Ve-01-3533_Dry Construction Stage 1The Mühlenkreiskliniken Aör Are Planning The Extension Of The Bad Hospital In 32545 Bad Oeynhausen At Kokturkanal 2 Oeynhausens To The Auguste Vikotria Clinic. To Prepare The Construction Site, Drywall Work Is Planned With The Following Main Materials: Pos. 02.01.0010 + 0020 245 M² Gk Partition Pos. 02.02.0020 360 M² Suspended Ceiling (Acoustic) Pos. 02.02.0030 105 M² Grid Ceiling Pos. 02.02.0170 200 M² Sloping Roof Cladding Pos. 02.02.0180 484 M² Thermal Insulation Over The 2Nd Floor