Publication In Accordance With Article 7 Paragraph 2 Of Regulation (Ec) 1370/2007 Of October 23, 2007 On The Intended Initiation Of A Negotiated Procedure Without A Call For Competition For The Interim Provision Of Transport Services In The Dreieich Sub-Network For 2 Years. The Client Intends To Award Transport Services In The Dreieich Sub-Network On An Interim Basis For Two Years To The Existing Operator Db Regio Ag Region Mitte. Publication In Accordance With Article 7 Paragraph 2 Of The Regulation (Ec) 1370/2007 Of October 23, 2007 On The Intended Initiation Of A Negotiation Procedure Without A Call For Competition For The Interim Provision Of Transport Services In The Dreieich Sub-Network For 2 Years. The Services To Be Awarded Are To Be Provided In The Dreieich Sub-Network On The Following Route: Line 61: Dieburg - Rödermark-Ober Roden - Dreieich-Buchschlag - Frankfurt (Main) Hbf. The Start Of Operations Of The Regular Traffic Service Contract Ends On December 14, 2030. A Total Of 10 Pesa Diesel Vehicles Are Currently In Use In The Dreieich Sub-Network. Db Regio Ag Central Region Is Also Responsible For The Maintenance Of These Vehicles. There Is A Political Will In Hesse To No Longer Tender Diesel-Powered Vehicles In New Tenders. The Client Has Adopted This Will. In Order To Further Reduce Noise And Exhaust Emissions, The Client Is Planning To Use Battery-Electric Multiple Units (Bemu) In The Dreieich Sub-Network In The Future, I.E. After The End Of The Current Transport Contract. The Client'S Planned Merger Of The Dreieich And Odenwald Sub-Networks With A Common Bemu Vehicle Fleet Had To Be Abandoned Due To The Infrastructure Expansion, Which Was Not Implemented On Time By The End Of 2030 And Remained Uncertain In Terms Of The Implementation Period, Including Overhead Line Island Systems (Olia) In The Odenwald Sub-Network, And Now Requires A Separate Re-Allocation Of The Two Sub-Networks. For The Night Parking Of The Bemu Vehicles, Post-Electrification Construction Measures (In Dieburg And Rödermark) Are Required, The Completion Of Which Will Not Be Completed Until December 2032. Based On Current Knowledge, Due To The Limited Competitive Situation And Production Capacities For Bemu Vehicles, Timely Vehicle Delivery By The Start Of Operations In December 2030 Seems Very Unlikely, If Not Impossible. Rather, The Client Assumes That The Bemu Vehicles Will Not Be Completed With Sufficient Certainty Until December 2032 And That They Cannot Be Safely Used In The Dreieich Sub-Network Until December 2032 At The Earliest. The Client Assumes That Only The Existing Operator, Db Regio Ag Region Mitte, Can Be Considered As A Contractor To Provide The Transport Service In The Dreieich Sub-Network Due To The Requirements For The Vehicle And Operating Concept, The Size Of The Sub-Network And The Short Contract Term. Db Regio Has Its Own 10 Diesel Vehicles Required To Provide The Service. In Addition, Db Regio Operates Its Own Workshop In The Dreieich Sub-Network (In The Immediate Vicinity Of Frankfurt Main Station) For The Operational Maintenance Of The Pesa Vehicles Used In The Dreieich Sub-Network. The Rmv Therefore Assumes That, For Several Factual Reasons, A Negotiation Procedure Without A Participation Competition In Accordance With Section 14 Paragraph 4 No. 2 Vgv Is Only Justified With Db Regio Ag Region Mitte, Europa-Allee 70-76, 60486 Frankfurt Am Main.