New Construction Of Railway Overpasses Bw 40, 44, 46 & Mv Switchgear Room Bw67.1 (Ve3001) For The Infrastructure Project Extension Of The Light Rail Line To The Bad Homburg V.D. Train Station. Heightthe Subject Of This Tender Is The Following Services: The Implementation Of The Measures Includes The Construction Of Three Railway Overpasses (Bw40, 44, 46) In Reinforced Concrete Construction And A Mv Switchgear Room (Bw67.1) In The Vicinity Of The Existing Railway Line 3611 Of Db Infrago Ag. Furthermore, The Measure Takes Place In The Inner-City Area Of ​​The City Of Bad Homburg With Residential Buildings, So High Demands Are Placed On Reducing Emissions. The Construction Of Track-Parallel Structures Can Sometimes Only Be Carried Out Under Db Infrago Ag'S Closure Breaks, Which Have Been Requested And Approved By The Ag. Due To The Dependencies On The Successor Trades, The Sü Langen Meile (Bw44) Is Scheduled To Be Completed By December 31, 2027. The Measures In Question Include Both The Construction Of The Engineering Structures And All The Preparatory Construction Work Required For This (E.G. Explosive Ordnance Sounding, Groundwater Measuring Point, Cable Route And Line Relocation Measures, Construction Of Working Levels And Ramps, Safety Services, Structures, Geomonitoring Route 3611 Etc.).New Construction Of Railway Overpasses Bw 40, 44, 46 & Mv Switchgear Room Bw67.1 (Ve3001) For The Infrastructure Project Extension Of The Light Rail Line To The Bad Homburg V.D. Train Station. Heightthe Extension Of The U2 Line Closes A Gap In The Local Rail Network. The Bad Homburg V. Train Station. D. Height Thus Becomes A Link Between The Subway And S-Bahn Lines As Well As The Existing And Planned Infrastructure Projects. The Extension Of The U2 Light Rail Line Increases The Attractiveness Of Local Public Transport In The Rhine-Main Region And In The City Of Bad Homburg V. D. Height. Existing Regional And Local Local Transport Offers Can Be Better Linked Spatially And Temporally. The Planning Approval Decision Is Enclosed With The Tender And Must Be Observed. The Subject Of This Tender Is The Following Services: The Implementation Of The Measures Includes The Construction Of Three Railway Overpasses (Bw40, 44, 46) In Reinforced Concrete Construction And A Mv Switchgear Room (Bw67.1) In The Vicinity Of The Existing Railway Line 3611 Of Db Infrago Ag. Furthermore, The Measure Takes Place In The Inner-City Area Of ​​The City Of Bad Homburg With Residential Buildings, So High Demands Are Placed On Reducing Emissions. The Construction Of Track-Parallel Structures Can Sometimes Only Be Carried Out Under Db Infrago Ag'S Closure Breaks, Which Have Been Requested And Approved By The Ag. Due To The Dependencies On The Successor Trades, The Sü Langen Meile (Bw44) Is Scheduled To Be Completed By December 31, 2027. The Measures In Question Include Both The Construction Of The Engineering Structures And All The Preparatory Construction Work Required For This (E.G. Explosive Ordnance Sounding, Groundwater Measuring Point, Cable Route And Line Relocation Measures, Construction Of Working Levels And Ramps, Safety Services, Structures, Geomonitoring Route 3611 Etc.). A Detailed Description Of The Services To Be Provided Can Be Found In The Tender Documents.