Sewer And Road Construction Work The Measure Includes: New Construction Of Rain Overflow Structure Rü11 With Fine Screen And Throttle Shaft Shaft Structure 73.39 Association Structure 73.19 New Mixed Water Sewer Dn 1300, L = 12 M Mixed Water Sewer Dn 1400 With Tw Gutter, L = 35 M Relief Channel Box Profile W / H = 2.20 / 0.75 M, L = 115 Mthrottle Section Dn 400 Stz, L = 13 Moutlet Structure With Connection To Gundbachterrain Modeling Section Of Relief Canal (Ffh Area) Relocation Of Water Pipe Dn300 Ggg, Connection To Pe & Ac, L = 70 M (Civil Engineering And Pipe Laying).