Extension Building “Project And Innovation Center” Including Conversion Of The Aok Hessen Education Center | Homberg (Ohm) - Carpentry Work - Structural Installationsthe Aok Is Planning The Structural Expansion Of Its Homberg/Ohm Education Center To Include A New Project And Innovation Center (P-I-C) At The Homberg/Ohm Location. The Existing Facility From The 1990S Is Located On The Outskirts Of Homberg/Ohm (Hesse / Vogelsberg District) In Lärchenweg 20. Expansion Building "Project And Innovation Center" Including Conversion Of The Aok Hessen Education Center | Homberg (Ohm) - Carpentry Work - Structural Installationsthe Aok Is Expanding Its Education Center In Homberg/Ohm With A New Building (P-I-C), Which Will Be Connected To The Existing Bta Building Via A Transition Building. The Central Central Building Remains As The Main Entrance And Is Expanded To The West. In Addition, The Bta Will Be Expanded In The Southern Area. Before New Construction Work Begins, Static Improvement Measures Must Be Carried Out On The Basement And Ground Floors Of The Existing Bta Building. Only Then Will Gutting, Dismantling And Demolition Work Take Place In These Areas. Operations Will Continue On The Upper Floors (Upper And Top Floors) Of The Bta Throughout The Entire Construction Period. The Technical Building Equipment And The Fire Alarm System Remain In Operation At All Times And Must Be Taken Into Account During All Work, Especially In The Area Of ​​The Doors. Required Votes, E.G. B. In The Event Of Shutdowns, Must Be Carried Out With The Operator. Due To Dismantling Work, Particularly In The Area Of ​​The West Gable, There Will Be A Temporary Loss Of Escape Routes. Appropriate Temporary Escape Solutions Will Be Created On Site And Must Be Taken Into Account. Due To The Construction Processes (Existing In Operation, Sectional Dismantling And New Construction), Special Requirements For Coordination, Fire Protection And The Function Of Escape And Rescue Route Doors Must Be Taken Into Account. Project Framework Data Existing Area: Component M - (Btm) On-Site Central Octagonal Entrance Building As A Central And Connecting Pavilion, 3 Floors. Remains In Operation Throughout The Construction Workcomponent A - (Bta) Western Branch Office And Training Areas Incl. Wellness And Sports Area In The Basement, 4 Floors (Including Attic) The Upper And Top Floors Will Remain In Operation Throughout The Entire Construction Work. Conversion And Extension Areas: Basement With Extension Building In Front (Restaurant) And Dining Room Area) And Ground Floor As Well As West Gable (Axis H) As An Extension Area Transitional Building And Component P-I-C Site Situation: Southern 4-Storey, Northern 3-Storey Component C - (Btc) Northern Side Arm: Technology, Warehouse, Changing Room, Workshop And Social Area, Current Location Kitchen/Food Supply And Media Transfer Point Remains During Of The Entire Construction Work In Operation. Version: 2 - Storey And Attic. Component B - (Btb) With Converted Attic, Construction Work In Operation. Eastern Branch Accommodation, 3-Storeyremains Throughout The Entire Project New Building Areastransitional Construction Connecting Structure In The Area Of The Gable Area Bta / Axish / Fire Wall Staircase And Elevator And Special Areaslv 118 Carpentry Work Constructive Installations 2 Of 3Component P-I-C Main Building "Project And Innovation Center" With Partially Projecting And Earth-Covered Delivery And Technical Floor, Large, Two-Storey, Stepped Auditorium Area With Terrace Area In Front In The Southern Outdoor Area Restaurant/Dining Room Extension To Bta Single-Storey Southern Extension Bta As A Restaurant And Dining Room Tea Kitchens = 3 Pieces Cloakrooms = 6 Pieces Seating Area (Parquet) (Standing And Lying In Total) = 100 M2 Acoustic Wall Cladding = 47 M2 Wall Cladding Painted = 25.5 M2 Seating Lounge = 10 M Slat Wall Acoustic Wall = 22.5 M2 Hpl Wall Cladding + Lintel Cladding Standing = 63 M2 Hpl Lintel Cladding Lying = 15 M2 Fire P